Geo-Physics and Borehole Drilling
Republic of Liberia: Liberia Water and Sewer Cooperation/ADB/FOSAT CONSULT. Design Review and Construction of Ground Water Schemes in New Georgia & Soul Clinic/Paynesville and Sanitation Facilities in Monrovia, Liberia.
Geo-physics and borehole drilling, mechanization of boreholes, transmission and distribution networks, 400m3 elevated steel water tanks and chemical dosing facilities for Soul Clinic and New Georgia. Rehabilitation of existing toilet facilities and Design and Construction of new toilet facilities for Soul Clinic and New Georgia. Inspection of sewer network and detailing rehabilitation requirements in Sinkor, Monrovia.
Actual Services Provided
Geophysical investigations and drilling supervision Design and construction supervise of the following:
- 30km of pipe lines in New Georgia with diameters between 63mm to 250mm transmission and distribution network
- 26km of pipe lines in Soul Clinic with diameters between 90mm to 250mm transmission and distribution network
- Approx. 120 isolation valves and approx. 90 air valves wash out and fire hydrants
- 2no. 400m3, 15m high elevated steel water tanks on reinforced concrete foundations.
- Training of LWSC Staff
- 3000 new house connections and 25 stand pipes.
- Sitting of boreholes and drilling supervision
- Mechanisation of proposed 11no. boreholes using generator sets
- Pump control stations for mechanised boreholes
- 2no. HTH Chlorination systems in Soul Clinic and New Georgia
- Approx. 200no. reinforced concrete chambers for pipe line specials
- Inspect 45km sewer mains from Bushrod Island to Sinkor and count the damaged or missing manholes, measure the damaged or missing sections of the line, identify sections that should be protected.
- Rehabilitation of 20 VIP/Pour Flush latrines and design & construct 23 new ones
Project Details
- Client Name:
- LWSC, Liberia
- Category:
- Projects Gallery
- Start Date:
- 01/04/2016
- End Date:
- 04/07/2018