400 MG Off-River Reservoir

400 MG Off-River Reservoir

Akim Oda, Akwatia and Winneba Water Supply Project: GoG/Exim Bank of Turkey Rehabilitation and Expansion: – Akim Oda Component.

400 MG off-river reservoir. 8MGD WTP with 2000m3 clear water well, 11km Transmission mains, 6000m3 Reservoir, 242km Distribution Pipeline, 2Nos 250m3/20m Elevated concrete water tanks and construction of 2units 4-storey 2-bedroom Staff Residential Buildings

Actual Services Provided

Design Review and Construction Supervision of the following:

Project Details

  • Client Name:
  • GWCL, Ghana
  • Category:
  • Projects Gallery
  • Start Date:
  • 01/12/2015
  • End Date:
  • 03/20/2018